CELPIP Reading Part 1Reading Correspondence Practice
Read an email and answer eleven questions — six about the message and five that complete a reply. Practise with 50 real exam-style sets, then check every answer with a clear explanation.
100+ Tests
Practice sets
Part 1
Reading section
11 Questions
Per test
~10 min
Real timing
Special Note: This practice interface is very similar to the actual CELPIP exam interface, helping you prepare with a realistic test experience.
Tip: Click the full screen icon in the top bar for a better, distraction free exam experience.
Read the following message.
From: Keira Patel
To: Devon Chen
Subject: Kiln Booking for the Student Bowls
Hi Devon,
I wanted to follow up about the ceramics club firing for our student bowl project. We booked the large kiln for Tuesday after applying glaze on Sunday. Everything appeared to be settled, and I had planned around the original arrangement. The problem is that the replacement glaze will arrive one day later than expected. The supplier discovered that one container had leaked before dispatch. As a result, the bowls cannot dry long enough for a safe Tuesday firing.
I first checked the shared kiln calendar and contacted the sculpture group. They are willing to exchange their Thursday slot for our Tuesday booking. Before suggesting a change, I reviewed our earlier messages and the details already confirmed. One detail to keep in mind is that our club already paid the energy fee for one full kiln load. My preferred solution is accepting the Thursday firing slot and moving the sculpture group to Tuesday. That would work best because the bowls will dry properly and neither group loses a booking.
That approach would preserve the parts of the plan that still work for everyone. If this is acceptable, I can update the remaining details as soon as I receive your reply. Another possibility is using the small kiln in two separate loads on Wednesday. The difficulty with that option is that two firings cost more and the second load would finish after the exhibition deadline. I considered cancelling the arrangement entirely, but that would create unnecessary work for everyone involved. For that reason, I would rather use one of the practical alternatives already available.
The practical detail I have not resolved is that the calendar change needs approval from both group coordinators. Please let me know how that part should be handled if the preferred plan is approved. I kept the records about the ceramics club firing for our student bowl project together for this review. No other related plan needs to change while this matter is reviewed. A written reply about accepting the Thursday firing slot and moving the sculpture group to Tuesday would prevent confusion.
Thank you for considering the timing and practical effects of this request. I need your answer by Monday at noon. The studio technician prepares firing schedules one day in advance. Most importantly, I am asking you to confirm the exchange with the sculpture group and approve the shared form. Once I hear from you, I will apply the glaze Tuesday and label every shelf plan.
Thanks,
Keira
Using the drop-down menu, choose the best option according to the information given in the message.
1. What is Keira’s main purpose?
2. What caused the current problem?
3. What has Keira already done?
4. Which solution does Keira prefer?
5. Which practical detail remains unresolved?
6. Why does Keira need an answer by Monday at noon?
Here is a response to the message. Complete the response by filling in the blanks. Select the best option for each blank from the drop-down menu.
Hi Keira,
Thanks for setting out the problem and the alternatives so clearly. I understand that . The original arrangement was reasonable, but the new complication calls for a different plan.
I can confirm that . That choice is suitable because . I have updated the records so the earlier arrangement is no longer treated as final.
Because our club already paid the energy fee for one full kiln load, . I will send the revised instructions after I finish the update today. The other option can remain available if something changes before the deadline.
Please reply by so I know you accept the revised plan. After your confirmation, I will send the updated kiln schedule and drying instructions. Thank you for providing enough detail to resolve this without another round of questions.
Best,
Devon
Continue Test 33 with
Pro
One plan unlocks all 300 tests on the site.
- 100 full mock testsFor CELPIP General and General LS
- 200 sectional mock testsListening, Reading, Writing and Speaking
- Instant resultsListening and Reading scored the moment you submit
- Detailed feedbackAnswer explanations and AI feedback on Writing and Speaking
Secure and instant access. Cancel anytime.