Practice by Question Type

CELPIP Reading Part 1Reading Correspondence Practice

Read an email and answer eleven questions — six about the message and five that complete a reply. Practise with 50 real exam-style sets, then check every answer with a clear explanation.

100+ Tests

Practice sets

Part 1

Reading section

11 Questions

Per test

~10 min

Real timing

Special Note: This practice interface is very similar to the actual CELPIP exam interface, helping you prepare with a realistic test experience.

Tip: Click the full screen icon in the top bar for a better, distraction free exam experience.

Reading Test 49 · Part 1 (Tree Planting Soil Delay)Pro

Read the following message.

From: Hana Wright

To: Reid Haddad

Subject: Updated Plan for Saturday's Tree Planting

Hi Reid,

I wanted to follow up about Saturday's tree planting along the community pathway. We planned to prepare every planting bed before the volunteers arrived. Everything appeared to be settled, and I had planned around the original arrangement. The problem is that only half of the soil will reach the site Friday. The supplier divided the order after one truck required repairs. As a result, the western planting area will not have enough soil in the morning.

I first checked which beds could be completed with the first delivery. The eastern section has enough soil for all twelve trees assigned there. Before suggesting a change, I reviewed our earlier messages and the details already confirmed. One detail to keep in mind is that you are leading the team that marks safe digging locations. My preferred solution is starting all volunteers in the eastern section and opening the western section after lunch. That would work best because the morning crew can remain productive while the second truck arrives.

That approach would preserve the parts of the plan that still work for everyone. If this is acceptable, I can update the remaining details as soon as I receive your reply. Another possibility is reducing the event to twelve trees. The difficulty with that option is that the remaining trees would need another watering and volunteer schedule. I considered cancelling the arrangement entirely, but that would create unnecessary work for everyone involved. For that reason, I would rather use one of the practical alternatives already available.

The practical detail I have not resolved is that the tool trailer must be moved when the second truck enters the service lane. Please let me know how that part should be handled if the preferred plan is approved. I kept the records about Saturday's tree planting along the community pathway together for this review. No other related plan needs to change while this matter is reviewed. A written reply about starting all volunteers in the eastern section and opening the western section after lunch would prevent confusion.

Thank you for considering the timing and practical effects of this request. I need your answer by Friday at three. The supplier needs an unobstructed delivery route confirmed. Most importantly, I am asking you to approve the phased work plan and move the trailer at noon. Once I hear from you, I will update the crew map and reserve the service lane.

Thanks,

Hana

Using the drop-down menu, choose the best option according to the information given in the message.

  1. 1. What is Hana’s main purpose?

  2. 2. What caused the current problem?

  3. 3. What has Hana already done?

  4. 4. Which solution does Hana prefer?

  5. 5. Which practical detail remains unresolved?

  6. 6. Why does Hana need an answer by Friday at three?

Here is a response to the message. Complete the response by filling in the blanks. Select the best option for each blank from the drop-down menu.

Hi Hana,

Thanks for setting out the problem and the alternatives so clearly. I understand that . The original arrangement was reasonable, but the new complication calls for a different plan.

I can confirm that . That choice is suitable because . I have updated the records so the earlier arrangement is no longer treated as final.

Because you are leading the team that marks safe digging locations, . I will send the revised instructions after I finish the update today. The other option can remain available if something changes before the deadline.

Please reply by so I know you accept the revised plan. After your confirmation, I will send the new crew map and truck arrival notice. Thank you for providing enough detail to resolve this without another round of questions.

Best,

Reid

Continue Test 49 withCoT.Pro

One plan unlocks all 300 tests on the site.

  • 100 full mock testsFor CELPIP General and General LS
  • 200 sectional mock testsListening, Reading, Writing and Speaking
  • Instant resultsListening and Reading scored the moment you submit
  • Detailed feedbackAnswer explanations and AI feedback on Writing and Speaking

Secure and instant access. Cancel anytime.

Answered 0 of 11