Practice by Question Type

CELPIP Reading Part 4Reading for Viewpoints Practice

Read an opinion article, answer five questions, then complete a reader's comment so it stays true to the argument. Practise with 50 real exam-style sets and review every answer.

100+ Tests

Practice sets

Part 4

Reading section

10 Questions

Per test

~12 min

Real timing

Special Note: This practice interface is very similar to the actual CELPIP exam interface, helping you prepare with a realistic test experience.

Tip: Click the full screen icon in the top bar for a better, distraction free exam experience.

Reading Test 38 · Part 4 (Tree Protection Bonds for Developers)Pro

Read the following article from a website.

Tree Bonds Proposed for New Housing Sites

Stonebridge planners have proposed refundable tree bonds for housing projects containing mature trees. Developers would recover the money when an arborist confirms that protected trees remain healthy two years after construction. If a tree dies from avoidable damage, part of the bond would fund replacements on or near the site. The proposal follows repeated complaints that preservation plans look convincing at approval but fail during excavation.

Resident organizer Amara Chen supports the bond because mature canopy cannot be replaced quickly by a row of saplings. Large trees cool sidewalks and give established streets their character, she argues. Chen believes a financial consequence would make protection fencing and root-zone rules more than paperwork. She would allow removal where an independent arborist finds a tree unsafe, but not merely because a different building layout is cheaper.

Developer Derek Osei objects to holding substantial funds for two years when a tree may decline because of drought or disease. He says lenders will treat the bond as another project cost, which may reduce funds available for below-market units. Osei also questions who decides whether construction caused a loss when several factors interact. He prefers modest nonrefundable canopy fees calculated at approval, giving builders a predictable expense.

Arborist Klara Petrov says a flat fee would be predictable but would provide little incentive to adjust construction once it begins. She proposes baseline health reports, root-protection inspections, and weather records so responsibility is based on documented evidence. Petrov would reduce a bond when builders exceed protection standards and plant replacement trees before work starts. This approach, she says, distinguishes unavoidable decline from neglect rather than assuming either one.

Housing director Luis Mendoza recommends a two-year pilot limited to projects with especially large healthy trees. Bond amounts would vary with tree condition, while an appeal panel would review disputed losses. The city would publish effects on redesigns, processing time, tree survival, and housing budgets before expanding the policy. Chen supports the limited start, and Osei says the appeal mechanism addresses part of his concern. Final bond values remain open for consultation.

Using the drop-down menu, choose the best option according to the information given in the website.

  1. 1. Which policy choice concerning urban tree protection is examined in this article?

  2. 2. What reasoning leads Amara Chen to support change?

  3. 3. Which risk receives the greatest emphasis from Derek Osei?

  4. 4. What distinguishes Klara Petrov's position from Amara Chen's?

  5. 5. What does the urban tree protection approach described in Paragraph 5 imply?

The following is a comment by a visitor to the website page. Complete the comment by choosing the best option to fill in each blank.

My street lost shade for years after protected trees were damaged beside a renovation. Regarding urban tree protection, .

Amara Chen argues that . The benefit identified by Amara Chen does not erase .

I also agree with Klara Petrov that . The appeal panel is essential because a drought-stressed tree should not automatically become proof of builder negligence. Luis Mendoza's process points to the most responsible outcome: .

Continue Test 38 withCoT.Pro

One plan unlocks all 300 tests on the site.

  • 100 full mock testsFor CELPIP General and General LS
  • 200 sectional mock testsListening, Reading, Writing and Speaking
  • Instant resultsListening and Reading scored the moment you submit
  • Detailed feedbackAnswer explanations and AI feedback on Writing and Speaking

Secure and instant access. Cancel anytime.

Answered 0 of 10